Dubai Roads Completes the Development of Manama Street

  • Publish date: Sunday، 27 November 2022 | Last update: Friday، 20 December 2024
Related articles
The Best Schools in Bahrain for Expat Children
Where to Eat for Bahrain's National Day?
Bahrain Creates Plans to Become a Top Global Tourist Destination

The Dubai Roads and Transport Authority announced the completion of the development work on Manama Street in Dubai, which is part of the Dubai-Al Ain Street Development Project, which opened in May 2022.

The Manama Street development works included the construction of a new traffic axis linking Al-Midan Street with Al-Manama Street, and crossing over the Dubai-Al-Ain Road through a bridge link with 4 traffic lanes in each direction with linking ramps with Dubai-Al-Ain Road.

فيديو ذات صلة

This browser does not support the video element.

The development work included converting the intersection of Manama Street with Nadd Al Hammar Street from a roundabout to an intersection controlled by traffic lights, and allocating two lanes with a minimum of left turns in all directions, as well as a free lane for turning right with 3 traffic lanes (minimum) for continuous traffic.

Follow us for more amazing beauty, fashion and luxury content on our Instagram and Facebook. Join us in our newsletter. Sign-up here.

This article was previously published on UAE Moments. To see the original article, click here